Steve and Timi continue renovations on their original purchase on the hill at Baj. There's still a long way to go but here's the progress to date.
|
|
At the front of the original building but the balcony and front steps have already gone and excavations have begun |
|
Much of the excavating completed. That bottom door is the entrance to the cellar and will be closed.Original balcony level just above that door.
|
|
The biggest rock they had to deal with during excavations |
|
Excavations complete and opening in front wall enlarged
|
|
The cellar. That doorway will disappear and entry will be from the inside |
|
Foundations repaired with concrete before further work
|
|
And that's as far as work had progressed for this edition. A lot of backfilling to go there |